MaltaToday previous editions

MALTATODAY 11 April 2021

Issue link: https://maltatoday.uberflip.com/i/1360420

Contents of this Issue

Navigation

Page 12 of 47

13 NEWS maltatoday | SUNDAY • 11 APRIL 2021 CONTACT Adriana Farrugia or Erika Arrigo on 21382741 for sponsorship opportunities SCAN THIS CODE USING A QR SCANNER APP TO WATCH THE LATEST EPISODE ON YOUR SMARTPHONE Small Ghadira extension to precede major works JAMES DEBONO A small section of the south- ern beach at Għadira Bay will be extended by 10m as part of studies preceding an extension of the entire beach. The section abuts onto the rocky shoreline opposite the Danish village. The small-scale project will allow the authorities to study the impacts of the exten- sion before c o n s i d e r - ing a much larger plan to extend the whole of Għadira as proposed in 2018. The pilot project will result in the extension of the beach by 1,200sq.m through dredging of sand from other parts of bay. The project is a far cry from plans presented by Projects Malta in 2018 to extend the whole length of the Għadira beach by 30 to 40 me- tres over an area of 38,200sq.m. The pilot project involves the construction of a groyne – a low, submerged wall built to check sand erosion. Monitoring data gathered during a minimum of three seasons will guide the assess- ment of wider interventions to extend the beach. The aim of the project, ac- cording to Projects Plus, the government agency responsi- ble for the project, is to enlarge the beach so as to be able to accommodate more visitors and avoid overcrowding, while offering "a sustainable solution for the ever-increasing influx of tourists" and restore lost sand due to erosion from the beach in recent years. The beach extension should withstand severe storms of a magnitude which occur once every 50 years. The beach will be extended by shifting sand from a burrow ar- ea which is further offshore, by means of a suction dredger. A pump will suck the sand from the burrow pit, through flexible pipework. A crane will lift the heavy equipment from the main road onto the beach, whilst a barge will be used to access different areas along the seabed. A long- reach excavator on top of the barge will smooth out and form the sand profiles underwater. The burrow pit was chosen after studies to exclude areas which include protected hab- itats like Posidonia Oceanica seagrass, and all works will be conducted over 20m from pro- tected habitats. The Environment and Re- sources Authority has made it clear that its go-ahead for the pilot project does not entail its approval for wider replenish- ment interventions proposed in the bay, which would still need to be assessed and decid- ed upon on their own merits. According to the project's ar- chitect, the smaller southern beach was chosen in order to limit the extent of the project and make it more easily revers- ible if it is not successful. The groyne will be construct- ed on the central rocky shore area because the "along-shore drift was noted to move from the southern part towards the northern areas". In 2019 the Malta Tourism Authority said that it could change its position against a beach concession on the rocky shoreline proposed by the own- ers of the Danish village if the beach is extended. Originally the MTA had approved the beach concession but changed its position following public uproar after the application was flagged by MaltaToday. The MTA had attributed its change of heart "to overriding circumstances" stemming from the fact that Għadira beach had shrunk considerably due to the inclement winter, thus reduc- ing the available public open space. However, it pointed out that it could revert to its original position "should the beach show signs of recovery and in- crease in surface area".

Articles in this issue

Archives of this issue

view archives of MaltaToday previous editions - MALTATODAY 11 April 2021